top of page
city-centre-4-surrey-lark-group-4_edited.jpg

Just when we thought that biotech couldn't get any cooler...

  • Jun 12, 2025
  • 1 min read


Just when we thought that biotech couldn't get any cooler, Vancouver-based AbCellera Biologics is expanding and upgrading their offices!


The new expansion includes the 110 W 4th building, which is half of a huge 2-building development that spans a full city block.


The combined development will serve as AbCellera's new biotechnical research campus, and will consist of a total of 380,000 sq ft of floor space. 110 W 4th building, in particular, will consist primarily of laboratory space, with 70% of it's floor plan allocated to that, and the remaining 30% for office and other support.


Corbally Consulting is thrilled to be involved in this project, providing shop drawing review and engineering for ACM panels, curtain wall as-built drawing review, analysis on on-site installation conditions, field reviews and associated Schedules.


Check out the last 3 pictures for updates from our most recent #sitevisit


Architect: Frankl Architecture

Developer: Beedie Group

Primary Structural Engineer: Glotman Simpson



Comments


© 2021 by Corbally Consulting Ltd.

bottom of page